The hard work and design of our new 6 kennel run has final come to a completion!
The building was raised and had new footing installed. The packing grade before back filling to proper level to accept the concrete floor.
Tile drain for outside kennel floor is feed into a small septic system for ease of cleanup.
Original photo of the building in the final stages of design.
Setting the 4 large prefabricated footings to hold the roof line.
Back filling packing and setting the 1 degree pitch for the water run off on the concrete floor to the tile drain.
Concrete was finally poured.Roof line and rafters was raised!
Last but not the least. The final design and build of the inside of our kennel building for our spaniels!